A plan for reusing existing materials

n a previous post, I showed a couple of pictures of the material that is gathering at the Green Garage as the building is slowly being deconstructed from the inside. We have no dumpster – nothing is leaving the building. We want to reuse most of the material (90%), and recycle most of the rest. In the video below, Tom O’Connor, a member of the materials group, explains the process.

Leave a Comment